Notice: This Wiki is now read only and edits are no longer possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.
Difference between revisions of "COSMOS/COSMOS iteration i11 plan"
< COSMOS
(→Bugs/ERs to consider) |
(→Bugs/ERs to consider) |
||
Line 203: | Line 203: | ||
</tr> | </tr> | ||
</table> | </table> | ||
+ | |||
+ | + a handful of other Low effort defects | ||
== RE/Build team work items (Saurabh Dravid) == | == RE/Build team work items (Saurabh Dravid) == |
Revision as of 00:18, 2 May 2008
Contents
- 1 COSMOS iteration i11 plan
- 1.1 Data Collection work items (Don Ebright)
- 1.2 Data Visualization work items (Sheldon Lee-Loy)
- 1.3 Resource Modeling work items (David Whiteman)
- 1.4 Management Enablement work items (Mark Weitzel)
- 1.5 RE/Build team work items (Saurabh Dravid)
- 1.6 QA work items (Srinivas Reddy Doma)
- 1.7 Web/Documentation work items (Rich Vasconi)
- 1.8 Mandatory for graduation (Ruth Lee/Tania Makins)=
COSMOS iteration i11 plan
Data Collection work items (Don Ebright)
Themes
For example:
- Stability
- Globalization
- Accessibility
Large work items
For example:
- Security
- Logging
Enhancements to consider
Enhancement | Description | Blocked by (if applicable) | Owner | Sizing |
---|---|---|---|---|
Data Visualization work items (Sheldon Lee-Loy)
Themes
- Stability - bugs that will improve the stability of the driver
- Cleanup -bugs that will help meet 1.0 release guidelines and help cleanup code
- Improve Usability - bugs that will improve existing tooling usabillity
- Improve Tooling - enhancements that will provide additional tooling to manage visualize and query MDRs
- Framework Improvements - bugs that will improve the core ui framework
Large work items
- Bugs and ERs are given a rough sizing
- Low - takes 1-3 days
- Medium - takes a week
- High - takes more than a week
Stability - bugs that will improve the stability of the driver
Bug | Severity | Description | Owner | Sizing |
---|---|---|---|---|
220201 | normal | CBE log report throws an exception when clicking on a chart | todjo06@ca.com | Low |
228964 | normal | Logic for deregistering all items/relationships of an MDR at test federating CMDB | leonard.richardson@ca.com | Medium |
229102 | normal | "Under IE: GraphResponseViewer is not showing any data under ""Records:templateID,MDRId,localId""" | martin.simmonds@ca.com | Low |
229109 | normal | "Under IE: Problems with Register/DeRegister Configuration items" | leonard.richardson@ca.com | Low |
229497 | normal | Exceptions when displaying record details | martin.simmonds@ca.com | Medium |
Cleanup -bugs that will help meet 1.0 release guidelines and help cleanup code
Bug | Severity | Description | Owner | Sizing |
---|---|---|---|---|
229800 | enhancement | Provide DOJO simple method descriptions for services available in COSMOS | sleeloy@ca.ibm.com | Medium-High |
http://wiki.eclipse.org/COSMOS_API_Cleanup | sleeloy@ca.ibm.com | High |
Improve Usability - bugs that will improve existing tooling usabillity
Bug | Severity | Description | Owner | Sizing |
---|---|---|---|---|
224154 | normal | Query Builder: The property value content is squished in certain reolutions | sleeloy@ca.ibm.com | Low |
221549 | normal | Status Reponse dialog box useability issues | amehrega@ca.ibm.com | Low |
228270 | normal | Full/Partial registration/derationstration dialog boxes should display icons of mdrs | amehrega@ca.ibm.com | Low |
228269 | normal | Have a consistent layout for dialog boxes | martin.simmonds@ca.com | Low |
228289 | normal | "Rename ""Name"" column to something more specific" | sleeloy@ca.ibm.com | Low |
229076 | normal | Need predefined queries for SML and test federating CMDB | sleeloy@ca.ibm.com | Low |
229083 | enhancement | Predefined queries with parameters | sleeloy@ca.ibm.com | Low |
228268 | enhancement | Provide icons for dialog box throughtout the ui | martin.simmonds@ca.com | Low |
224173 | enhancement | Dialog Box: Press escape should close dialog box | martin.simmonds@ca.com | Low |
224166 | enhancement | Improve the Graph Response Viewer View | amehrega@ca.ibm.com | High (3.5) |
224172 | enhancement | Improve registratoin/deregistration response dialog box | amehrega@ca.ibm.com | High (1.5) |
223241 | enhancement | Full screen mode toolbar button | sleeloy@ca.ibm.com | Medium |
224169 | enhancement | Ability to resize dialog box. | martin.simmonds@ca.com | Medium |
Improve Tooling - enhancements that will provide additional tooling to manage visualize and query MDRs
Bug | Severity | Description | Owner | Sizing |
---|---|---|---|---|
229081 | enhancement | Allow a way to bypass query builder | sleeloy@ca.ibm.com | Medium |
222504 | enhancement | UI cannot show the query request | sleeloy@ca.ibm.com | Medium |
211093 | enhancement | Custom visualization for example MDR | sleeloy@ca.ibm.com | Medium |
223271 | enhancement | Need ability to rename saved queries | sleeloy@ca.ibm.com | Medium |
223270 | enhancement | Need ability to manage queries | sleeloy@ca.ibm.com | Medium-High |
Framework Improvements - bugs that will improve the core ui framework
Bug | Severity | Description | Owner | Sizing |
---|---|---|---|---|
229411 | enhancement | Upgrade to Dojo 1.1 | sleeloy@ca.ibm.com | Medium-High |
Resource Modeling work items (David Whiteman)
Themes
- Stability - reduce defect backlog in validator/import/export/editor
- Completeness - expanding tests to cover more nuances from spec, and fixing defects uncovered by this activity
- Documentation - integrate tooling with online documentation using contextual help
Large work items
Bugs/ERs to consider
Sizing legend:
- Low - takes 1-3 days
- Medium - takes a week
- High - takes more than a week
Bug # | Severity | Owner | Description | Sizing |
---|---|---|---|---|
228223 | major | amehrega@ca.ibm.com | Data center sample validation errors - TestPluginMainValidator failures | Low-Medium |
199164 | normal | dlwhiteman@us.ibm.com | Opening non-workspace SML-IF file does not open in SML-IF editor | Low |
185391 | major | dlwhiteman@us.ibm.com | Export SMLIF wizard > ruleBindings page shows no documents | Low |
221409 | major | dlwhiteman@us.ibm.com | Identifying definition content type fails when WTP is installed | Low |
229890 | major | amehrega@ca.ibm.com | Locating SML documents remotely | Low |
177263 | normal | dlwhiteman@us.ibm.com | Issues with importing from an SMLIF document | Low |
200423 | normal | amehrega@ca.ibm.com | JUnit test TestSMLModelUnits.testRuleInvalidBinding failure | Low |
Management Enablement work items (Mark Weitzel)
Themes
- Consumability - producing a toolkit that significantly improves the speed & reduces the learning curve with building MDRs
- Stability - driving out bugs and fixing them
- Testing - improving JUnits to build automated test to connect to and query MDRs built from the toolkit
- Globalization - externalizing all error messages & UI labels
- Documentation - integrate tooling with online documentation using contextual help
Large work items
- Logging
- API Cleanup
Bugs/ERs to consider
Sizing legend:
- Low - takes 1-3 days
- Medium - takes a week
- High - takes more than a week
Bug # | Severity | Description | Owner | Sizing |
---|---|---|---|---|
220639 | enh | Provide integration with Run on Server to launch web UI in Eclipse web browser | dlwhiteman@us.ibm.com | Medium (David + Sheldon) |
228877 | nor | Update data manager toolkit to use example query handler instead of overriding getQueryOperation | dlwhiteman@us.ibm.com | Low |
+ a handful of other Low effort defects
RE/Build team work items (Saurabh Dravid)
Themes
For example:
- Stability
- Globalization
- Accessibility
Large work items
For example:
- Security
- Logging
Enhancements to consider
Enhancement | Description | Blocked by (if applicable) | Owner | Sizing |
---|---|---|---|---|
QA work items (Srinivas Reddy Doma)
Themes
For example:
- Stability
- Globalization
- Accessibility
Large work items
For example:
- Security
- Logging
Enhancements to consider
Enhancement | Description | Blocked by (if applicable) | Owner | Sizing |
---|---|---|---|---|
Web/Documentation work items (Rich Vasconi)
Themes
For example:
- Stability
- Globalization
- Accessibility
Large work items
For example:
- Security
- Logging
Enhancements to consider
Enhancement | Description | Blocked by (if applicable) | Owner | Sizing |
---|---|---|---|---|
Mandatory for graduation (Ruth Lee/Tania Makins)=