Skip to main content
Jump to: navigation, search

Difference between revisions of "Build to Manage"

(BtM Demo at Eclipse Con 2007)
(BtM Demo at Eclipse Con 2007)
Line 30: Line 30:
 
''' Demo Scenario'''
 
''' Demo Scenario'''
 
* Start w/ARM to trace a transaction
 
* Start w/ARM to trace a transaction
** When ARM Completes or Fails, signal an event (in this case CBE).  In our case, we'll fail the transaction.
+
** When ARM Completes or Fails, signal an event (in this case CBE).  Other possibilities would be if a transaction takes too long, or if it gets lost, fire the event.  In our case, we'll fail the transaction.

Revision as of 14:22, 18 January 2007

Here is an overview of the File:WSDM--BTM-TPTP-AG-01-DEC-06.zip.

Design documents for BtM WSDM tooling in TPTP 4.4 are here: Design Documents BtM TPTP 4.4

Use cases for BtM WSDM tooling in TPTP 4.4. are here: BtM WSDM TPTP 4.4 Use Cases

Code level dependencies in BtM WSDM Tooling TPTP 4.4: BtM WSDM TPTP 4.4 Depedencies


BtM Demo at Eclipse Con 2007

Instrumentation Technologies

  • Overview of each (15 Min Total)
    • CBEs
    • ARM
    • JMX
    • WSDM
    • Managed Agent Explorer
      • What's important is the commonality between JMX & WSDM
  • What are we working on for 4.4
  • Questions to be able to answer
    • Relationship of WEF to CBE


Demo Scenario

  • Start w/ARM to trace a transaction
    • When ARM Completes or Fails, signal an event (in this case CBE). Other possibilities would be if a transaction takes too long, or if it gets lost, fire the event. In our case, we'll fail the transaction.

Back to the top