Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "Bill of Materials (Buckminster)"

(New page: {{Backlink|Buckminster Project}} A BOM is the result of the resolution of a CQUERY. It contains exact versions and loc...)
 
Line 1: Line 1:
 
{{Backlink|Buckminster Project}}
 
{{Backlink|Buckminster Project}}
A [[Bill of Materials (Buckminster)|BOM]] is the result of the resolution of a [[Component Query (Buckminster)|CQUERY]]. It contains exact versions and locations of all components. A BOM is normally appointed by a [[MSPEC (Buckminster)|MSPEC]] that drives the materialization process.
+
A [[Bill of Materials (Buckminster)|BOM]] is the result of the resolution of a [[Component Query (Buckminster)|CQUERY]]. It contains exact versions and locations of all components. A BOM is normally appointed by a [[Materialization Specification (Buckminster)|MSPEC]] that drives the materialization process.
  
 
You can find the XML-Schema for the BOM [http://www.eclipse.org/buckminster/schemas/metadata-1.0.xsd here].
 
You can find the XML-Schema for the BOM [http://www.eclipse.org/buckminster/schemas/metadata-1.0.xsd here].

Revision as of 04:09, 1 June 2007

< To: Buckminster Project
A BOM is the result of the resolution of a CQUERY. It contains exact versions and locations of all components. A BOM is normally appointed by a MSPEC that drives the materialization process.

You can find the XML-Schema for the BOM here.

Back to the top