Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.
Difference between revisions of "BPEL Restructuring"
m |
m |
||
Line 1: | Line 1: | ||
− | ==Purpose== | + | == Purpose == |
− | + | ||
− | + | After a discussion with the SOA PMC it was decided that it would in the community's best interests to have the BPEL Designer project move to the SOA top-level project. This will promote the visibility of the project to a community that is more directly involved in the definition and use of business process design tools, thereby attracting developers with a vested interest in improving and maintaining the BPEL Designer code base. | |
− | + | ||
− | + | === Code === | |
− | + | As part of the code restructuring we propose moving to a GIT repository. If possible, we would like to maintain the existing commit history in the new repository. | |
− | + | ||
− | + | ||
− | + | ||
− | + | A new unix group, soa.bpel, will be created for the project. All existing committers will become part of this group. | |
− | + | ||
+ | All code in the existing CVS repository at /cvsroot/technology/bpel (technology.bpel group) will be moved to a new GIT repository at /gitroot/bpel (new soa.bpel group). The project directory structure will remain the same. | ||
− | === | + | === Website === |
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | The location of the existing BPEL project website will not physically change, it will remain at /cvsroot/org.eclipse/www/bpel but access rights should be changed to read/write for the new soa.bpel group. | |
− | + | <br> | |
− | + | ||
− | === | + | === Download Site === |
− | + | ||
− | The | + | The BPEL Designer update site will move from http://download.eclipse.org/technology/bpel/update-site/ to http://download.eclipse.org/bpel/updates/ |
− | + | Access rights should be changed to read/write for the soa.bpel group. | |
− | + | ||
− | + | === Bugzilla === | |
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | The entire bugzilla history will be moved from the "Technology" Classification to "SOA". Product, Component, Version and Target will all remain as-is. | |
− | + | ||
− | + | === Mailing Lists and Forums === | |
− | A copy of the IP Log can be found here: [[Media:IPLogBPELJune2011.pdf]] | + | The current newsgroup, bpel-dev@eclipse.org and the BPEL Forum http://www.eclipse.org/forums/index.php?t=thread&frm_id=43 will remain as-is. |
+ | |||
+ | The VCS commit notification mailing list bpel-commits@eclipse.org will need to be hooked in to the new GIT repository. | ||
+ | |||
+ | == Committers == | ||
+ | |||
+ | This is a list of all active committers; these will also be granted committer rights to the new project. | ||
+ | |||
+ | *Bob Brodt (bbrodt@redhat.com) | ||
+ | *Nick Boldt (nboldt@redhat.com) | ||
+ | *Oleg Danilov (oleg.v.danilov@intel.com) | ||
+ | *Tobias Liefke (eclipse@liefke.biz) | ||
+ | *Grid Qian (fqian@redhat.com) | ||
+ | *Vincent Zurczak (vincent.zurczak@petalslink.com) | ||
+ | |||
+ | == Project Plan and Restructuring Schedule == | ||
+ | |||
+ | [http://www.eclipse.org/projects/project-plan.php?projectid=technology.bpel The current project plan can be found here]. The goal is to complete the code move by end of July, 2011 and produce a 1.0 release by end of August, 2011. | ||
+ | |||
+ | The Restructuring Review has been tentatively scheduled for July 7 to July 13, 2011. | ||
+ | |||
+ | A copy of the IP Log can be found here: [[Media:IPLogBPELJune2011.pdf]] | ||
+ | |||
+ | ==Communications Channels== | ||
+ | All questions and concerns about this review should be addressed in the [http://www.eclipse.org/forums/index.php?t=thread&frm_id=43 BPEL Designer Forum] or the [https://dev.eclipse.org/mailman/listinfo/bpel-dev Mailing List]. |
Revision as of 15:25, 29 June 2011
Contents
Purpose
After a discussion with the SOA PMC it was decided that it would in the community's best interests to have the BPEL Designer project move to the SOA top-level project. This will promote the visibility of the project to a community that is more directly involved in the definition and use of business process design tools, thereby attracting developers with a vested interest in improving and maintaining the BPEL Designer code base.
Code
As part of the code restructuring we propose moving to a GIT repository. If possible, we would like to maintain the existing commit history in the new repository.
A new unix group, soa.bpel, will be created for the project. All existing committers will become part of this group.
All code in the existing CVS repository at /cvsroot/technology/bpel (technology.bpel group) will be moved to a new GIT repository at /gitroot/bpel (new soa.bpel group). The project directory structure will remain the same.
Website
The location of the existing BPEL project website will not physically change, it will remain at /cvsroot/org.eclipse/www/bpel but access rights should be changed to read/write for the new soa.bpel group.
Download Site
The BPEL Designer update site will move from http://download.eclipse.org/technology/bpel/update-site/ to http://download.eclipse.org/bpel/updates/
Access rights should be changed to read/write for the soa.bpel group.
Bugzilla
The entire bugzilla history will be moved from the "Technology" Classification to "SOA". Product, Component, Version and Target will all remain as-is.
Mailing Lists and Forums
The current newsgroup, bpel-dev@eclipse.org and the BPEL Forum http://www.eclipse.org/forums/index.php?t=thread&frm_id=43 will remain as-is.
The VCS commit notification mailing list bpel-commits@eclipse.org will need to be hooked in to the new GIT repository.
Committers
This is a list of all active committers; these will also be granted committer rights to the new project.
- Bob Brodt (bbrodt@redhat.com)
- Nick Boldt (nboldt@redhat.com)
- Oleg Danilov (oleg.v.danilov@intel.com)
- Tobias Liefke (eclipse@liefke.biz)
- Grid Qian (fqian@redhat.com)
- Vincent Zurczak (vincent.zurczak@petalslink.com)
Project Plan and Restructuring Schedule
The current project plan can be found here. The goal is to complete the code move by end of July, 2011 and produce a 1.0 release by end of August, 2011.
The Restructuring Review has been tentatively scheduled for July 7 to July 13, 2011.
A copy of the IP Log can be found here: Media:IPLogBPELJune2011.pdf
Communications Channels
All questions and concerns about this review should be addressed in the BPEL Designer Forum or the Mailing List.