Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.
Difference between revisions of "Aperi Documentation Plan"
m (→Review Comments) |
|||
(5 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
'''Author: Chris King''' | '''Author: Chris King''' | ||
− | The attached | + | The attached documents describe the information development (ID) deliverables for Aperi Storage Manager (Aperi). |
− | Aperi Storage Manager (Aperi) | + | |
− | Aperi | + | = Aperi milestone 5 (m5) = |
− | + | Aperi m5 is scheduled for contribution in Q2 2009. | |
− | + | ||
− | + | * [http://www.eclipse.org/aperi/tech/Aperi_IDPlan_m5.doc Aperi documentation plan for m5 (MS Word)] | |
− | Please download and view the attached | + | * [http://www.eclipse.org/aperi/tech/Aperi_IDPlan_m5.pdf Aperi documentation plan for m5 (PDF)] |
− | suggestions through bugzilla (https://bugs.eclipse.org/bugs/enter_bug_wizard.cgi?product=Aperi) | + | |
+ | '''How to provide review comments''' | ||
+ | |||
+ | Please download and view either of the attached documents for m5. You can provide comments, edits, and suggestions through bugzilla (https://bugs.eclipse.org/bugs/enter_bug_wizard.cgi?product=Aperi) | ||
or respond to the aperi-dev mailing list (https://dev.eclipse.org/mailman/listinfo/aperi-dev). | or respond to the aperi-dev mailing list (https://dev.eclipse.org/mailman/listinfo/aperi-dev). | ||
− | * [http://www.eclipse.org/aperi/tech/ | + | '''Review Log''' |
+ | |||
+ | PDF: [http://www.eclipse.org/aperi/tech/Aperi_IDPlan_log_m5.pdf Comment log for Aperi documentation plan m5] | ||
+ | |||
+ | |||
+ | = Aperi milestone 4 (m4) = | ||
+ | |||
+ | Aperi m4 was contributed in Q4 2007. | ||
+ | |||
+ | * [http://www.eclipse.org/aperi/tech/Aperi_IDPlan.doc Aperi documentation plan for m4 (MS Word)] | ||
+ | * [http://www.eclipse.org/aperi/tech/Aperi_IDPlan.pdf Aperi documentation plan for m4 (PDF)] |
Latest revision as of 15:08, 26 August 2008
Author: Chris King
The attached documents describe the information development (ID) deliverables for Aperi Storage Manager (Aperi).
Aperi milestone 5 (m5)
Aperi m5 is scheduled for contribution in Q2 2009.
How to provide review comments
Please download and view either of the attached documents for m5. You can provide comments, edits, and suggestions through bugzilla (https://bugs.eclipse.org/bugs/enter_bug_wizard.cgi?product=Aperi) or respond to the aperi-dev mailing list (https://dev.eclipse.org/mailman/listinfo/aperi-dev).
Review Log
PDF: Comment log for Aperi documentation plan m5
Aperi milestone 4 (m4)
Aperi m4 was contributed in Q4 2007.