Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "Aperi Development Status Meeting 06/16/08"

 
Line 9: Line 9:
 
Passcode: <FONT COLOR="red"> '''003399''' </FONT>
 
Passcode: <FONT COLOR="red"> '''003399''' </FONT>
 
</big>  
 
</big>  
<!-- COMMENT
 
 
== Attendees: ==
 
== Attendees: ==
'''Brocade''' (John Crandall), '''IBM''' (Al Heitman, Dave Wolfe, Chris King, Hans Lin, Martine Wedlake, Ramani Routray, Tom Guinane, Russ Warren, Todd Singleton), '''LSI''' (Jenny Monesson)
+
'''Brocade''' (John Crandall), '''IBM''' (Al Heitman, Todd Singleton, Michelle Lowe),  
 
== Minutes: ==
 
== Minutes: ==
COMMENT -->
 
== Agenda: ==
 
 
* '''Project Leader Notes:'''  
 
* '''Project Leader Notes:'''  
 +
** Installer Issue
 +
*** Issues surfaced last week that Eclipse installers are not allowed to download non-approved 3rd party libraries.  We are investigating this issue further and putting a remediation plan in place.
 
** 2008 planning (R0.5)
 
** 2008 planning (R0.5)
 +
*** Still need milestones for Virtual Fabric / FC Security spec. from Brocade.  Al sent a request to John for milestone details.
 +
*** Still need milestones for Linux HA Cluster support from Novell.  Robert indicated he could provide that in May.  Al set a request to Robert for any milestone details.
 +
*** Al sent schedule updates to Todd and Chris.  Al asked for any comments on the changes.  Todd indicated the updates were ok.  Al will request comments from Chris outside this meeting.
 
** Aperi Committers:
 
** Aperi Committers:
 +
*** The following committers still need the legal “paperwork” completed before full committer access is granted.
 +
**** John Crandall 
 +
**** Jenny Monesson
 
* '''Release Engineer Notes (Todd):'''
 
* '''Release Engineer Notes (Todd):'''
 
** Build status/process
 
** Build status/process
 +
*** Last week, Todd reported a problem with build system and Jerry is working on fixing it.  Todd reported that this is resolved now.
 +
*** Al will look at the build logs for the 3rd party compile problem.
 
* '''Aperi Downloads:'''
 
* '''Aperi Downloads:'''
 +
** June totals to date are 83 total, with 37 for SAN Simulator and 46 for SRM.  We are only 4 downloads away from the 3000th download.
 
** [http://www.eclipse.org/aperi/downloads/AperiDownloadsChart.pdf Latest stats]   
 
** [http://www.eclipse.org/aperi/downloads/AperiDownloadsChart.pdf Latest stats]   
 
** [http://live.eclipse.org/node/343 Aperi webinar]   
 
** [http://live.eclipse.org/node/343 Aperi webinar]   
 
* '''Development items/issues:'''
 
* '''Development items/issues:'''
 +
** SSO –  Todd is writing a browser based sample client along with the documentation for the SSO client which will be used as a starting point for the LIC sample application  unit test framework.  Todd indicated that the client sample is slightly bigger than planned and sized it at 12 days.  Al updated the master schedule and sent to Todd for review. 
 +
** LIC – Dave is working on the specs for LIC.
 +
** SAN Simulator - The code is checked into CVS.  Todd completed the build.  We need to get committer community to do a code review before we release it.  Al will initiate committer code review soon.  Ramani is writing the IDVT test plan.  Al sent a note to Ramani to get the latest status. 
 +
** Virtual Fabric / FC Security spec – need update from John.
 +
** Linux HA cluster support – need update from Robert.
 
* '''IDVT:'''  
 
* '''IDVT:'''  
 
** [http://wiki.eclipse.org/index.php/Aperi/Test/Status Test Status]
 
** [http://wiki.eclipse.org/index.php/Aperi/Test/Status Test Status]
Line 29: Line 42:
 
*** Aperi Total Open 'Enhancement' Defects - [https://bugs.eclipse.org/bugs/buglist.cgi?query_format=advanced&short_desc_type=allwordssubstr&short_desc=&classification=Technology&product=Aperi&long_desc_type=allwordssubstr&long_desc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&status_whiteboard_type=allwordssubstr&status_whiteboard=&keywords_type=allwords&keywords=&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&bug_severity=enhancement&emailtype1=substring&email1=&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=&chfieldto=Now&chfieldvalue=&cmdtype=doit&order=Reuse+same+sort+as+last+time&field0-0-0=noop&type0-0-0=noop&value0-0-0= by priority & severity]
 
*** Aperi Total Open 'Enhancement' Defects - [https://bugs.eclipse.org/bugs/buglist.cgi?query_format=advanced&short_desc_type=allwordssubstr&short_desc=&classification=Technology&product=Aperi&long_desc_type=allwordssubstr&long_desc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&status_whiteboard_type=allwordssubstr&status_whiteboard=&keywords_type=allwords&keywords=&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&bug_severity=enhancement&emailtype1=substring&email1=&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=&chfieldto=Now&chfieldvalue=&cmdtype=doit&order=Reuse+same+sort+as+last+time&field0-0-0=noop&type0-0-0=noop&value0-0-0= by priority & severity]
 
* '''ID:'''  
 
* '''ID:'''  
 +
** Chris is working on the ID plan update.  He plans to send it out for review by the end of June.
 
* '''Project Schedule:'''  
 
* '''Project Schedule:'''  
 
** Latest [http://wiki.eclipse.org/index.php/Aperi_Project_Schedule Schedule].
 
** Latest [http://wiki.eclipse.org/index.php/Aperi_Project_Schedule Schedule].
Line 50: Line 64:
 
*** Sept 22-25, 2008, Hyatt Regency Hotel, Santa Clara, CA
 
*** Sept 22-25, 2008, Hyatt Regency Hotel, Santa Clara, CA
 
*** [http://www.surveymonkey.com/s.aspx?sm=KEAv_2fFLQaW6VCMTlbw0Dqg_3d_3d Call for Presentations]  
 
*** [http://www.surveymonkey.com/s.aspx?sm=KEAv_2fFLQaW6VCMTlbw0Dqg_3d_3d Call for Presentations]  
** '''Next Meeting''' 07/14/08 (No meeting 6/30 or 7/7)
+
** '''Next Meeting''' 06/23/08  
 
* '''Open Forum:'''
 
* '''Open Forum:'''
 +
** Al indicated that there will be no meetings on June 30 and July 7 due to Al taking a vacation.
 +
** Aperi Forum: No update this week.

Latest revision as of 16:06, 16 June 2008

Aperi Wiki Home Aperi Meetings Aperi Development Meetings

Dial in numbers:

Toll Free: 877-421-0029 International: 770-615-1246 Passcode: 003399

Attendees:

Brocade (John Crandall), IBM (Al Heitman, Todd Singleton, Michelle Lowe),

Minutes:

  • Project Leader Notes:
    • Installer Issue
      • Issues surfaced last week that Eclipse installers are not allowed to download non-approved 3rd party libraries. We are investigating this issue further and putting a remediation plan in place.
    • 2008 planning (R0.5)
      • Still need milestones for Virtual Fabric / FC Security spec. from Brocade. Al sent a request to John for milestone details.
      • Still need milestones for Linux HA Cluster support from Novell. Robert indicated he could provide that in May. Al set a request to Robert for any milestone details.
      • Al sent schedule updates to Todd and Chris. Al asked for any comments on the changes. Todd indicated the updates were ok. Al will request comments from Chris outside this meeting.
    • Aperi Committers:
      • The following committers still need the legal “paperwork” completed before full committer access is granted.
        • John Crandall
        • Jenny Monesson
  • Release Engineer Notes (Todd):
    • Build status/process
      • Last week, Todd reported a problem with build system and Jerry is working on fixing it. Todd reported that this is resolved now.
      • Al will look at the build logs for the 3rd party compile problem.
  • Aperi Downloads:
    • June totals to date are 83 total, with 37 for SAN Simulator and 46 for SRM. We are only 4 downloads away from the 3000th download.
    • Latest stats
    • Aperi webinar
  • Development items/issues:
    • SSO – Todd is writing a browser based sample client along with the documentation for the SSO client which will be used as a starting point for the LIC sample application unit test framework. Todd indicated that the client sample is slightly bigger than planned and sized it at 12 days. Al updated the master schedule and sent to Todd for review.
    • LIC – Dave is working on the specs for LIC.
    • SAN Simulator - The code is checked into CVS. Todd completed the build. We need to get committer community to do a code review before we release it. Al will initiate committer code review soon. Ramani is writing the IDVT test plan. Al sent a note to Ramani to get the latest status.
    • Virtual Fabric / FC Security spec – need update from John.
    • Linux HA cluster support – need update from Robert.
  • IDVT:
  • ID:
    • Chris is working on the ID plan update. He plans to send it out for review by the end of June.
  • Project Schedule:
  • Action Items:
Item Owner Target Status
Obtain two mentors Al 06/27/08 Per new development process rules, we need to obtain two project mentors. Harm Sluiman is one. Discussed with Tom last week. Bjorn has a list of mentors we can use. Al to follow up with Bjorn.
Document Control Al 05/29/08 Write up text for Aperi document control. Al will write up a process to get documents reviewed and approved.

Back to the top