Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Aperi Development Status Meeting 03/05/07

Revision as of 20:54, 6 March 2007 by Guinane.us.ibm.com (Talk | contribs)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Aperi Wiki Home Aperi Meetings Aperi Development Meetings

Attendees:

Brocade (John Crandall), IBM (Brenda Haynes, Craig Laverone, Dave Wolfe, Hans Lin, Khan Tasinga, Prasenjit Sarkar, Rodica Ciurea, Simona Constantin, Tom Guinane)

Minutes:

  • Project Leader Notes (Ted)
  • Release Engineer Notes (Todd) - Todd could not attend the meeting, but left these notes:
    • Legacy build - done. Hans raised a few concerns (per our emails this weekend). I will continue to look into these problems and look to resolve them. So there might be a defect or two, but the initial line item is complete. The only other thing I need to do here is send out documentation of the design and usage of the new build.
    • Integrating the RCP GUI build. This is not complete. Rodica wants to get a few answers from Dave concerning BIRT. She is going to get that information to me today and we'll continue from there. The question she has for Dave has to do with some recent changes made in the GUI design, so they do not pertain to issues we could have resolved weeks ago.
    • I leave for vacation next Monday, for two weeks. I expect to have the build stable and reliable this week, prior to my departure.
  • Aperi Downloads
    • There is a problem with the Eclipse download counting mechanism. Bugzilla 173144 was opened to address it. Until this problem is resolved, we are not running any download statistics.
  • Project Schedule:
    • Latest Schedule Updates made in the file.
    • Dave has an updated GUI schedule with new tasks.
      • It will require assistance from two other team members in order to complete in the current Release 0.3 timeframe.
      • Taking out Report Designer and Viewer for now – will pick up later this month
      • Test should be able to handle the changes – Hans confirmed.
      • Will need Chris to evaluate to see if ID can work with this.
      • Tom will update the master schedule with these changes and put out an append in aperi-dev for the team to look at and review
  • IDVT
    • Test Status
    • Hans has posted a new S-curve for the remaining test duration.
    • Currently slightly ahead of schedule
    • Still have a few build issues. Hans is working with Ted and Todd to resolve.
    • Also have DB2 bug 172220 that Prasenjit is working on
  • ID
    • Release Notes
    • [Note Chris – Is this link the same place that the new Release Notes will be located?]
  • Action Items
]-
Item Owner Target Status
Third Party Dependency Questionnaire Tom ongoing Questionnaires submitted 9/6. - Utilizing the IP Log to track the individual IPZilla entries for each Third Party Contribution Questionnaire. See IP Log section below for new updates on this.
  • Other:
    • Eclipse Con March 5-8 2007, Santa Clara Convention Center: http://www.eclipsecon.org/2007/
      • Members and Committers Boot Camp, Sunday
        • Tom attended
        • 50 people, spread across Eclipse community, mostly new projects, bt some new committers/members on mature projects (
        • Sampling of my table: projects (Subversive, ECF, Maya), countries (Canada, Germany, Bulgaria, Sweden, India, Czech Republic)
        • Ward Cunningham - ran meeting and held ‘brain exercises’
        • Bjorn Freeman-Benson reviewed the new development process including the new portal.
        • Key items/messages:
          • Become extroverts – tell people what you are doing
          • New: Two mentors are required for each incubation project
        • Janet Campbell – Licensing and IP Process (Award for most questions)
          • IP Backlog roughly 240 IPZillas (140 - Europa)
          • New parallel process for projects in incubation
          • Once she gets to our IPZillas, she should be able to OK them quickly, then we can put third party code in cvs – but IPZillas not approved until we exit incubation and deliver Release 1 - RISK
          • Are we still using the same levels of code we submitted CQ’s for? – require new CQ’s
        • Donald Smith covered the governance structure
        • Ian Skerret talked marketing
          • Community building is toughest challenge
      • Members Meeting, Today 1pm to 5pm (reception 6pm-8pm)
      • Todd and Ted are registered; Todd's short talk is on Wednesday; they will be in the Meet the Experts Lounge on Wednesday morning as well
    • Next Meeting will be March 12th
  • Open Forum

Back to the top