Skip to main content

Notice: This Wiki is now read only and edits are no longer possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

DTP Project Lead Meeting Minutes: September 28, 2009

Revision as of 17:59, 6 October 2009 by Unnamed Poltroon (Talk) (New page: ← Back to DTP Project Lead Meeting Minutes: 2009, July through September page ==Attendees== *Brian "Fitz" Fitzpatr...)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Back to DTP Project Lead Meeting Minutes: 2009, July through September page

Attendees

  • Brian "Fitz" Fitzpatrick (Red Hat)
  • Linda Chan (Actuate)
  • Brian Payton (IBM)
  • Hemant Kolwalkar (IBM)

Minutes

  • The DTP 1.7.1 release is out the door. (The RC3 build was renamed to the Release build.)
  • Brian P. updated the target milestone dates for the SQL Dev Tools Inbox bugs that were marked as 1.7.1
  • There are some 1.7.1 bugs assigned to Hui Cao (Max) that are still set to 1.7.1. These need to be investigated and re-targetted
  • Fitz has been working on some 1.7.2 bugs. He said he got tired of not coding :-)
  • The Helios project plan has not been created yet. We will discuss the project plan at the PMC meeting tomorrow.
  • Hemant will investigate 286382 and get back to us

Back to the top