Notice: This Wiki is now read only and edits are no longer possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.
EclipseLink/Development/JPA 2.0/validation api integration
< EclipseLink | Development | JPA 2.0
Revision as of 16:36, 3 March 2009 by Unnamed Poltroon (Talk) (→JPA 2.0: Validation API Integration)
JPA 2.0: Validation API Integration
Date | Committer(s) | Description |
---|---|---|
March 3, 2009 | gyorke | Initial feature template |
Summary
In JPA 2.0 the specification has defined requirements to integrate with the Validation API (JSR-303). The details are to be determined.
Multiple sections
Work Estimate
- Integation work
- approx 5 days
- Develop Testing
- approx 3 days
- Document and execute Validation implementation plan.
- approx 5 days
Concepts
Functional Requirements
- Support integration with Validation API (jsr-303) as defined by JPA specification
Design
Design Constraints
API
Documentation
Implementation
Testing
Open Issues
This section lists the open issues that are still pending that must be decided prior to fully implementing this project's requirements.
Issue # | Owner | Description / Notes |
---|---|---|
Decisions
This section lists decisions made. These are intended to document the resolution of open issues or constraints added to the project that are important.
Issue # | Description / Notes | Decision |
---|---|---|
Future Considerations
During the research for this project the following items were identified as out of scope but are captured here as potential future enhancements. If agreed upon during the review process these should be logged in the bug system.