Skip to main content

Notice: This Wiki is now read only and edits are no longer possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

ORMF progress report 5 jan 09

Revision as of 10:18, 6 January 2009 by Unnamed Poltroon (Talk) (Barbara)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

< To: ORMF progress reports

Achim

Goals

Achievements

Barbara

Goals

  1. Consolidate comments on requirements model and indicate way forward
  2. Start standards survey

Achievements

Bobby

Goals

Achievements

Joel

Goals

  1. Be able to run the client against the OSGi server.
  2. Update Riena to latest version.
  3. Document the server architecture and design.

Achievements

Jojy

Goals

Achievements

Wolfgang

Goals

Achievements

Yahya

Goals

Achievements

Back to the top