Notice: This Wiki is now read only and edits are no longer possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.
Difference between revisions of "Development Resources/Project Summary Page"
Line 14: | Line 14: | ||
If all of those conditions are met and the logo is still not showing up, then it’s possible that the project meta-data doesn’t have the correct version control paths specified–this affects whether the committer is considered active by the dashboard. Any committer on the project can manage the meta-data in the Portal to correct this situation. In fact, there is a handy link at the top of the summary page to open a bug with the project to fix it. All other questions should be directed to the EMO (emo@eclipse….). | If all of those conditions are met and the logo is still not showing up, then it’s possible that the project meta-data doesn’t have the correct version control paths specified–this affects whether the committer is considered active by the dashboard. Any committer on the project can manage the meta-data in the Portal to correct this situation. In fact, there is a handy link at the top of the summary page to open a bug with the project to fix it. All other questions should be directed to the EMO (emo@eclipse….). | ||
− | |||
− | |||
==Please see== | ==Please see== | ||
*[http://dev.eclipse.org/blogs/eclipsewebmaster/2009/11/25/wait-wheres-our-logo/ Wait, Where's Our Logo!?] | *[http://dev.eclipse.org/blogs/eclipsewebmaster/2009/11/25/wait-wheres-our-logo/ Wait, Where's Our Logo!?] | ||
+ | |||
+ | This page is moderated by the EMO. |
Revision as of 23:07, 29 November 2009
The Eclipse Project Summary page gives a lot of information about each project, based on lots of data sources at Eclipse. Some of these come from our internal database, some from the project meta-data in the Portal, and some from the Dash project’s dashboard.
Company Logos
Company logos sometimes appear in the committers pane, like this:
It’s not immediately apparent how those logos get there. So here’s what you need in order to get your company’s logo to show up in this pane:
- At least one committer has to be listed as an employee of the company in question
- The company needs to have their logo uploaded to the Portal (and needs to be a member of course)
- The committer must be active
- The committer must be on this project
If all of those conditions are met and the logo is still not showing up, then it’s possible that the project meta-data doesn’t have the correct version control paths specified–this affects whether the committer is considered active by the dashboard. Any committer on the project can manage the meta-data in the Portal to correct this situation. In fact, there is a handy link at the top of the summary page to open a bug with the project to fix it. All other questions should be directed to the EMO (emo@eclipse….).
Please see
This page is moderated by the EMO.