Skip to main content

Notice: This Wiki is now read only and edits are no longer possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "Equinox Minutes - 20090915"

Line 27: Line 27:
 
*** A tool to piece together an image with Linux, Equinox and p2 enabled to manage with a web-based UI.
 
*** A tool to piece together an image with Linux, Equinox and p2 enabled to manage with a web-based UI.
 
*** Student is interested in continuing work.
 
*** Student is interested in continuing work.
 +
** Pascal talked a bit about trying to replace YUM with p2 to manage linux.
 +
** Pascal describe other GSOC projects
 +
*** Web-installer - project did not progress well.  Did not move very far.
 +
*** Matt investigated tools for interrogating p2 meta-data.  Allows you to look at the dependencies of a p2 repo.  Work still to be done to get it integrated into the agent.  All UI based.
 
* Equinox book status
 
* Equinox book status

Revision as of 10:43, 15 September 2009

Attendees

  • Jeff
  • Stoyan
  • Pascal
  • Tom
  • DJ
  • John
  • Simon

Agenda

  • Need to update google calendar.
  • Status
  • Use of DS for compendium service implementations
    • The org.eclipse.update.configurator currently uses an approach.
    • Use another lazy mechanism to register the services.
    • Open a bug against compendium to discuss more ideas.
  • API to interrogate DS components.
    • Equinox impl provides console commands to do this
    • Apache Felix has a programmatic API
    • Should we 1) invent our own API 2) collaborate with AF to use their API 3) go straight to spec an API
  • GSOC
    • Ian and Jeff were working with a student (Chris Matthews).
      • Create a "small" VM image to run on the cloud.
      • Started rather large and pairing it back.
      • Based on Linux.
      • A tool to piece together an image with Linux, Equinox and p2 enabled to manage with a web-based UI.
      • Student is interested in continuing work.
    • Pascal talked a bit about trying to replace YUM with p2 to manage linux.
    • Pascal describe other GSOC projects
      • Web-installer - project did not progress well. Did not move very far.
      • Matt investigated tools for interrogating p2 meta-data. Allows you to look at the dependencies of a p2 repo. Work still to be done to get it integrated into the agent. All UI based.
  • Equinox book status

Back to the top