Difference between revisions of "DTP PMC and Project Lead Meeting Minutes: March 16, 2009"
(→Agenda) |
(→Attendees) |
||
Line 3: | Line 3: | ||
==Attendees== | ==Attendees== | ||
*Brian Fitzpatrick | *Brian Fitzpatrick | ||
− | * | + | *Emily Kapner |
*Larry Dunnell | *Larry Dunnell | ||
+ | *Linda Chan | ||
+ | |||
*Hung Hsi | *Hung Hsi | ||
*John Graham | *John Graham | ||
*Brian Payton | *Brian Payton | ||
− | |||
==Regrets== | ==Regrets== |
Latest revision as of 14:01, 16 March 2009
← Back to DTP PMC and Project Lead Meeting page
Contents
Attendees
- Brian Fitzpatrick
- Emily Kapner
- Larry Dunnell
- Linda Chan
- Hung Hsi
- John Graham
- Brian Payton
Regrets
- Hemant Kolwalkar (vacation)
Agenda
- M6 Status
- We were down to 3 bugs assigned to the 1.7 M4, M5, and M6 milestones that either need to be resolved. I closed one and assigned the other two to M7.
- Still had a number of bugs associated with 1.6.1 and 1.6.2 milestones. I have now set all of them to future or Galileo.
- SQL Dev refactoring
- Other issues?
- No meeting next week due to EclipseCon 2009, but we'll meet on March 30th
- Status
- [Weekly Nag] We are at ~6 bugs with no target milestone set that need to be dispositioned (Thanks for keeping this list small!). Please keep at this list daily if at all possible. [Here's the query.]
- Open discussion