Difference between revisions of "Cosmos Release Plan"
m (→COSMOS Release Plan Version 1.0.0) |
|||
Line 2: | Line 2: | ||
== COSMOS Release Plan Version 1.0.0== | == COSMOS Release Plan Version 1.0.0== | ||
+ | |||
+ | |||
+ | === Community Systems Management Open Source (COSMOS) 1.0 Project Plan (Draft) === | ||
+ | |||
+ | Please send comments about this plan to the [[cosmos-mgmt@eclipse.org|cosmos-mgmt@eclipse.org]] project management mailing list. | ||
+ | |||
+ | |||
+ | This document lays out the feature and API set for the COSMOS 1.0 release. | ||
+ | * [[#Release Deliverables]] | ||
+ | * [[#Release Milestones]] | ||
+ | * [[#Project Designs]] | ||
+ | * [[#Features]] | ||
+ | * [[#Defects]] | ||
+ | |||
+ | This plan describes the release deliverables, release milestones, and the plan items for the four projects under COSMOS. Each plan item covers a feature or API that is to be added to COSMOS, or some aspect of COSMOS that is to be improved. Each plan item has its own entry in the COSMOS bugzilla database, with a title and a concise summary (usually a single paragraph) that explains the work item at a suitably high level so that everyone can readily understand the work item. | ||
+ | |||
+ | |||
+ | Fixing bugs, improving test coverage, documentation, examples, performance tuning, usability, etc. are considered routine ongoing maintenance activities and are not included in this plan unless they would also involve a significant change to the API or feature set, or involve a significant amount of work. The intent of the plan is to account for all interesting feature work. | ||
+ | |||
+ | ==== Release Deliverables ==== | ||
+ | |||
+ | The following release deliverables are provided: | ||
+ | * Runtime | ||
+ | * Source | ||
+ | * Examples | ||
+ | * Component Tests | ||
+ | * Data Collection Implementation | ||
+ | * Data Visualization Implementation | ||
+ | * Resource Modeling Implementation | ||
+ | |||
+ | ==== Release Milestones ==== | ||
+ | |||
+ | The COSMOS 1.0 release is targeted for general availability on 20-July-2007. All release deliverables will be available for download as soon as the release has been tested and validated in the target configurations. There is an allocation of resource to defect removal in all iterations. The first Iterations 1-3 will contain the bulk of the enhancement work, while Iteration 4 will mainly be used to stabilize and shut down the release. | ||
+ | |||
+ | |||
+ | '''Release Milestones''' | ||
+ | |||
+ | {|border = "1" cellpadding="1" | ||
+ | |- | ||
+ | !Milestone | ||
+ | !Date | ||
+ | !Description | ||
+ | |- | ||
+ | |Iteration 1 | ||
+ | |Fri 02/23/2007 | ||
+ | |Demo development | ||
+ | |- | ||
+ | |Iteration 2 | ||
+ | |Fri 04/06/2007 | ||
+ | |Development & Test | ||
+ | |- | ||
+ | |Iteration 3 | ||
+ | |Fri 05/18/2007 | ||
+ | |Development & Test | ||
+ | |- | ||
+ | |Iteration 4 | ||
+ | |Fri 06/15/2007 | ||
+ | |Shut down and Europa General Availability June 29 2007 | ||
+ | |- | ||
+ | |Availability | ||
+ | |Fri 07/20/2007 | ||
+ | |Available for POCs | ||
+ | |} | ||
+ | |||
+ | ==== Themes ==== | ||
+ | |||
+ | The COSMOS project adopted the following theme which represents the key focus area for COSMOS enhancements in the year ahead. | ||
+ | * Provide an open platform that is standards-based for extensibility and openness | ||
+ | * Provide exemplary tools for monitoring and management of popular open distributed platforms | ||
+ | * Establish base framework: | ||
+ | * Data collection normalization and persistence framework | ||
+ | * Validation/Editing/Viewing framework based on SML | ||
+ | |||
+ | ==== Project Designs ==== | ||
+ | |||
+ | The COSMOS project is comprised of four projects, managed in a coordinated fashion, across which the plan items are allocated. COSMOS projects include: | ||
+ | |||
+ | * '''Data Collection Project''' - Exploits instrumentation and wrappers developed in the Build to Manage component and other existing infrastructure to normalize and store data received from various data collection and management systems. | ||
+ | * '''Data Visualization Project''' - Aims to provide value by building a standards-based integration infrastructure that provides access to two dimensions of the COSMOS management architecture: COSMOS Data Collection and COSMOS Resource Modeling. | ||
+ | * '''Resource Modeling Project''' - Aims to provide support for validating and building a common model to represent the information being shared in a system management scenario. The Service Modeling Language Interchange Format (SML-IF) will be used to share model components between the tools involved in a system management activity. | ||
+ | * '''Management Enablement''' - To be implemented in a future release | ||
+ | |||
+ | Designs for these projects will be checked in to the COSMOS bugzilla database so that developers can reference them as they create designs for specific plan items. | ||
+ | |||
+ | ==== Features ==== | ||
+ | |||
+ | Plan items targeted for this release represent the addition of new features or areas where existing features will be significantly reworked or enhanced. Plan items are allocated to the projects indicated above. | ||
+ | |||
+ | '''COSMOS Data Collection Project Plan Items''' | ||
+ | {|border = "1" cellpadding="1" | ||
+ | |- | ||
+ | !Status | ||
+ | !Description | ||
+ | |- | ||
+ | |In Plan | ||
+ | |Define and build the COSMOS data collection framework. This includes: definition and implementation of the component assembly framework SPI, implementation of binding and component context loading services for an Equinox OSGi host, definition of component APIs supporting all currently defined component types (data source, data sink, filter, transformer), base classes for all currently defined component types, component assembly schema, automated build process for the data collection component, user documentation for adopters of the framework, and automated unit test cases. The following enhancements are being used to track this work: [https://bugs.eclipse.org/bugs/show_bug.cgi?id=174347 (174347)] [https://bugs.eclipse.org/bugs/show_bug.cgi?id=177821 (177821)] [https://bugs.eclipse.org/bugs/show_bug.cgi?id=180318 (180318)] . | ||
+ | |- | ||
+ | |In Plan | ||
+ | |Exemplary components for the data collection framework. [https://bugs.eclipse.org/bugs/show_bug.cgi?id=180322 (180322)] | ||
+ | |- | ||
+ | |Not in Plan | ||
+ | |} | ||
+ | |||
+ | |||
+ | '''COSMOS Data Visualization Project Plan Items''' | ||
+ | {|border = "1" cellpadding="1" | ||
+ | |- | ||
+ | !Status | ||
+ | !Description | ||
+ | |- | ||
+ | |In Plan | ||
+ | |Visualize a read-only model (the ui is not expected to modify the resource model or data collection information), provide a simple navigation system based on a resource graph, show properties of a resource, and provide visualization of collected resource information. [https://bugs.eclipse.org/bugs/show_bug.cgi?id=180069 (180069)] | ||
+ | |- | ||
+ | |Not in Plan | ||
+ | |} | ||
+ | |||
+ | '''COSMOS Resource Modeling Project Plan Items''' | ||
+ | {|border = "1" cellpadding="1" | ||
+ | |- | ||
+ | !Status | ||
+ | !Description | ||
+ | |- | ||
+ | |In Plan | ||
+ | |Create agent descriptors in SML to represent logging agents. [https://bugs.eclipse.org/bugs/show_bug.cgi?id=178590 (178590)] | ||
+ | |- | ||
+ | |In Plan | ||
+ | |Provide a data layer for Data Visualization access to resource, which includes the following services: data filtering, data grouping, data sorting and data counts. [https://bugs.eclipse.org/bugs/show_bug.cgi?id=180068 (180068)] | ||
+ | |- | ||
+ | |In Plan | ||
+ | |Provide the concept of a repository under the resource modeling subproject. [https://bugs.eclipse.org/bugs/show_bug.cgi?id=179828 (179828)] | ||
+ | |- | ||
+ | |In Plan | ||
+ | |SML validator should accept input other than File resources. [https://bugs.eclipse.org/bugs/show_bug.cgi?id=181594 (181594)] | ||
+ | |- | ||
+ | |In Plan | ||
+ | |Create more test cases for the validation plug-in. [https://bugs.eclipse.org/bugs/show_bug.cgi?id=172682 (172682)] | ||
+ | |- | ||
+ | |Not in Plan | ||
+ | |} |
Revision as of 14:48, 19 April 2007
COSMOS Wiki > COSMOS Work Items
Contents
COSMOS Release Plan Version 1.0.0
Community Systems Management Open Source (COSMOS) 1.0 Project Plan (Draft)
Please send comments about this plan to the cosmos-mgmt@eclipse.org project management mailing list.
This document lays out the feature and API set for the COSMOS 1.0 release.
This plan describes the release deliverables, release milestones, and the plan items for the four projects under COSMOS. Each plan item covers a feature or API that is to be added to COSMOS, or some aspect of COSMOS that is to be improved. Each plan item has its own entry in the COSMOS bugzilla database, with a title and a concise summary (usually a single paragraph) that explains the work item at a suitably high level so that everyone can readily understand the work item.
Fixing bugs, improving test coverage, documentation, examples, performance tuning, usability, etc. are considered routine ongoing maintenance activities and are not included in this plan unless they would also involve a significant change to the API or feature set, or involve a significant amount of work. The intent of the plan is to account for all interesting feature work.
Release Deliverables
The following release deliverables are provided:
- Runtime
- Source
- Examples
- Component Tests
- Data Collection Implementation
- Data Visualization Implementation
- Resource Modeling Implementation
Release Milestones
The COSMOS 1.0 release is targeted for general availability on 20-July-2007. All release deliverables will be available for download as soon as the release has been tested and validated in the target configurations. There is an allocation of resource to defect removal in all iterations. The first Iterations 1-3 will contain the bulk of the enhancement work, while Iteration 4 will mainly be used to stabilize and shut down the release.
Release Milestones
Milestone | Date | Description |
---|---|---|
Iteration 1 | Fri 02/23/2007 | Demo development |
Iteration 2 | Fri 04/06/2007 | Development & Test |
Iteration 3 | Fri 05/18/2007 | Development & Test |
Iteration 4 | Fri 06/15/2007 | Shut down and Europa General Availability June 29 2007 |
Availability | Fri 07/20/2007 | Available for POCs |
Themes
The COSMOS project adopted the following theme which represents the key focus area for COSMOS enhancements in the year ahead.
- Provide an open platform that is standards-based for extensibility and openness
- Provide exemplary tools for monitoring and management of popular open distributed platforms
- Establish base framework:
- Data collection normalization and persistence framework
- Validation/Editing/Viewing framework based on SML
Project Designs
The COSMOS project is comprised of four projects, managed in a coordinated fashion, across which the plan items are allocated. COSMOS projects include:
- Data Collection Project - Exploits instrumentation and wrappers developed in the Build to Manage component and other existing infrastructure to normalize and store data received from various data collection and management systems.
- Data Visualization Project - Aims to provide value by building a standards-based integration infrastructure that provides access to two dimensions of the COSMOS management architecture: COSMOS Data Collection and COSMOS Resource Modeling.
- Resource Modeling Project - Aims to provide support for validating and building a common model to represent the information being shared in a system management scenario. The Service Modeling Language Interchange Format (SML-IF) will be used to share model components between the tools involved in a system management activity.
- Management Enablement - To be implemented in a future release
Designs for these projects will be checked in to the COSMOS bugzilla database so that developers can reference them as they create designs for specific plan items.
Features
Plan items targeted for this release represent the addition of new features or areas where existing features will be significantly reworked or enhanced. Plan items are allocated to the projects indicated above.
COSMOS Data Collection Project Plan Items
Status | Description |
---|---|
In Plan | Define and build the COSMOS data collection framework. This includes: definition and implementation of the component assembly framework SPI, implementation of binding and component context loading services for an Equinox OSGi host, definition of component APIs supporting all currently defined component types (data source, data sink, filter, transformer), base classes for all currently defined component types, component assembly schema, automated build process for the data collection component, user documentation for adopters of the framework, and automated unit test cases. The following enhancements are being used to track this work: (174347) (177821) (180318) . |
In Plan | Exemplary components for the data collection framework. (180322) |
Not in Plan |
COSMOS Data Visualization Project Plan Items
Status | Description |
---|---|
In Plan | Visualize a read-only model (the ui is not expected to modify the resource model or data collection information), provide a simple navigation system based on a resource graph, show properties of a resource, and provide visualization of collected resource information. (180069) |
Not in Plan |
COSMOS Resource Modeling Project Plan Items
Status | Description |
---|---|
In Plan | Create agent descriptors in SML to represent logging agents. (178590) |
In Plan | Provide a data layer for Data Visualization access to resource, which includes the following services: data filtering, data grouping, data sorting and data counts. (180068) |
In Plan | Provide the concept of a repository under the resource modeling subproject. (179828) |
In Plan | SML validator should accept input other than File resources. (181594) |
In Plan | Create more test cases for the validation plug-in. (172682) |
Not in Plan |