Skip to main content

Notice: This Wiki is now read only and edits are no longer possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "Mylyn/Meetings"

(Next meeting: Tuesday, December 5, 10-11am PT)
Line 1: Line 1:
 +
[[Category:Mylar]]
  
 +
Tel: '''1-866-362-7064''' or 1-613-287-8000, Passcode: '''892048#'''
 +
 +
=== Next meeting: Tuesday, December 5, 10-10:30am PT ===
 +
 +
Planning meetings are open to all.  When adding an item to the agenda please include your name.
 +
* API status (Mik)
 +
** Externalizers ITaskListExternalize
 +
** Listeners API, primarily ITaskListChangeListener
 +
* Remaining priorities for 1.0 (Mik)
 +
* Proxy settings status (Rob)
 +
* Subclipse integration and Team API (Eugene)
 +
 +
----
 +
 +
=== Past Meetings ===
 +
 +
==== Tuesday, November 21, 10-11am PT ====
 +
 +
Planning meetings are open to all.  When adding an item to the agenda please include your name.
 +
 +
* Remaining 1.0RC1 items (Mik)
 +
** Issues with tack context (multiple folders, unfiltering issues, etc)
 +
** Issues with new local task UI (focus, inline vs. editor)
 +
** Moving task drop down and pause button out of Task List UI?
 +
* Bugzilla and repository infrastructure status (Rob)
 +
* Trac status (Steffen)
 +
* Web connector status (Mik)
 +
* JIRA connnector status (Mik & Eugene)
 +
Actions
 +
* Mik emails newsgroup/mylar-dev about task list toolbar changes
 +
* Mik fixes classpath of context.core xmlrpc-use
 +
* Visible editor always unfiltered
 +
* Eugene files bug on editor color problem
 +
* Steffen files bug People section with JIRA
 +
 +
==== Tuesday, November 14, 10-11am PT ====
 +
 +
Agenda
 +
* Mylar 1.0 priorities.
 +
* Pause button UI (Mik?)
 +
Actions
 +
* Need people section for Trac
 +
* Discuss removing commit context button on newsgroup
 +
* Allow proxy settings to be specified per-repository
 +
 +
==== Tuesday, October 31, 10-11am PT ====
 +
 +
Planning meetings are open to all.  When adding an item to the agenda please include your name.
 +
 +
* Web repository connector UI , [https://bugs.eclipse.org/bugs/show_bug.cgi?id=158069 bug 158069] (Eugene)
 +
* Authentication infrastructure and connectors (Rob)
 +
* Offline support for JIRA (Mik)
 +
* Pause button UI (Mik)
 +
 +
 +
==== Tuesday, October 24, 10-11am PT ====
 +
 +
Planning meetings are open to all.  When adding an item to the agenda please include your name.
 +
 +
Agenda
 +
* 0.8 post-mortem (Mik)
 +
* Storage of offline task data (See [[Mylar Task List]]) (Rob)
 +
* JIRA priorities (Mik)
 +
* Web repository connector UI , [https://bugs.eclipse.org/bugs/show_bug.cgi?id=158069 bug 158069] (Eugene)
 +
* [http://dev.eclipse.org/mhonarc/lists/mylar-dev/msg00706.html Alternative integration] with remote repositories (Eugene)
 +
 +
Actions
 +
* Investigate Lucene as store for offline task data (Rob)
 +
* Investigate showing working sets as top-level nodes in Task List (Mik)
 +
 +
==== Tuesday, October 17, 10-11am PT ====
 +
 +
Agenda
 +
* 0.8 release planning
 +
* Web repository connector UI , [https://bugs.eclipse.org/bugs/show_bug.cgi?id=158069 bug 158069] (Eugene)
 +
* Rich editor for Trac (Steffen?)
 +
* Repository task data (Rob)
 +
** Offline persistence: object serialization (current), xml, database [https://bugs.eclipse.org/bugs/show_bug.cgi?id=160389 bug 160389]
 +
** Lazy loading [https://bugs.eclipse.org/bugs/show_bug.cgi?id=157257 bug 157257]
 +
* Issues with Task monitoring and filtering for projects with more then one source folder
 +
* Jira integration planning
 +
* User guide and improving the docs
 +
 +
Actions
 +
* Need "Add to Task List" action on query hits
 +
* Consider merging the above action with dialog for "Add Existing Task..."
 +
* Need to consider pre-fetching task data for query hits
 +
 +
==== Tuesday, September 26 2006, 10-11am PT ====
 +
* 0.7 release planning
 +
* Project and repository association (Rob)
 +
* 1.0 planning (Mik)
 +
 +
==== Wednesday, August 23 2006, 10-11am PT ====
 +
* Planning for 0.6.2
 +
* Generic web Repository Connector integration (Eugene)
 +
* Trac Connector rich editor (Steffen)
 +
* AbstractRepositoryConnector split into core and UI
 +
* Planning for 0.7 and 1.0
 +
* Zest website integration and release cycles
 +
 +
==== Wednesday, August 2 2006, 10-11am PT ====
 +
Agenda
 +
* 0.6.1 post-mortem
 +
* 0.6.2 and 1.0 planning
 +
* Summer of Code status
 +
** Trac Connector (Steffen)
 +
** Bugzilla enhancements (Jeff)
 +
** JIRA
 +
* Design discussion on splitting AbstractRepositoryConnector into core/ui
 +
* Sandbox release for web connector (Eugene)
 +
Vacations
 +
* Rob: 3rd - 8th
 +
* Mik: 8th - 17th
 +
Actions
 +
* Consumers of APIs update Javadocs as they use them, a la wiki
 +
* Decide on conference call time and interval next meeting
 +
* Investigate Rome dependency for Sandbox (Mik)
 +
 +
==== Thursday, July 6 2006, 10am PT ====
 +
* wrap up discussion of 0.6 release
 +
* Trac integration status (Steffen)
 +
* enhancing Bugzilla connector status (Jeff)
 +
* Connector naming conventions
 +
* tasks API discussion. String-based task id, separate task id, url and repository url, (issues 146396, 149624, 149509), other refactoring of tasks, hits, query and repository classes
 +
* UI for repository settings
 +
* prioritizing for 0.7 and beyond
 +
* planning and use of Bugzilla priorities
 +
 +
==== Tuesday, June 13 2006, 10am PT ====
 +
* Schedule a regular meeting time and interval
 +
* Google SoC: Trac integration (Steffen)
 +
* Google Soc: enhancing Bugzilla connector (Jeff)
 +
* Repository connector API discussion (Mik)
 +
* Prioritize tasks for 0.6 (Mik)

Revision as of 01:44, 5 December 2006


Tel: 1-866-362-7064 or 1-613-287-8000, Passcode: 892048#

Next meeting: Tuesday, December 5, 10-10:30am PT

Planning meetings are open to all. When adding an item to the agenda please include your name.

  • API status (Mik)
    • Externalizers ITaskListExternalize
    • Listeners API, primarily ITaskListChangeListener
  • Remaining priorities for 1.0 (Mik)
  • Proxy settings status (Rob)
  • Subclipse integration and Team API (Eugene)

Past Meetings

Tuesday, November 21, 10-11am PT

Planning meetings are open to all. When adding an item to the agenda please include your name.

  • Remaining 1.0RC1 items (Mik)
    • Issues with tack context (multiple folders, unfiltering issues, etc)
    • Issues with new local task UI (focus, inline vs. editor)
    • Moving task drop down and pause button out of Task List UI?
  • Bugzilla and repository infrastructure status (Rob)
  • Trac status (Steffen)
  • Web connector status (Mik)
  • JIRA connnector status (Mik & Eugene)

Actions

  • Mik emails newsgroup/mylar-dev about task list toolbar changes
  • Mik fixes classpath of context.core xmlrpc-use
  • Visible editor always unfiltered
  • Eugene files bug on editor color problem
  • Steffen files bug People section with JIRA

Tuesday, November 14, 10-11am PT

Agenda

  • Mylar 1.0 priorities.
  • Pause button UI (Mik?)

Actions

  • Need people section for Trac
  • Discuss removing commit context button on newsgroup
  • Allow proxy settings to be specified per-repository

Tuesday, October 31, 10-11am PT

Planning meetings are open to all. When adding an item to the agenda please include your name.

  • Web repository connector UI , bug 158069 (Eugene)
  • Authentication infrastructure and connectors (Rob)
  • Offline support for JIRA (Mik)
  • Pause button UI (Mik)


Tuesday, October 24, 10-11am PT

Planning meetings are open to all. When adding an item to the agenda please include your name.

Agenda

Actions

  • Investigate Lucene as store for offline task data (Rob)
  • Investigate showing working sets as top-level nodes in Task List (Mik)

Tuesday, October 17, 10-11am PT

Agenda

  • 0.8 release planning
  • Web repository connector UI , bug 158069 (Eugene)
  • Rich editor for Trac (Steffen?)
  • Repository task data (Rob)
    • Offline persistence: object serialization (current), xml, database bug 160389
    • Lazy loading bug 157257
  • Issues with Task monitoring and filtering for projects with more then one source folder
  • Jira integration planning
  • User guide and improving the docs

Actions

  • Need "Add to Task List" action on query hits
  • Consider merging the above action with dialog for "Add Existing Task..."
  • Need to consider pre-fetching task data for query hits

Tuesday, September 26 2006, 10-11am PT

  • 0.7 release planning
  • Project and repository association (Rob)
  • 1.0 planning (Mik)

Wednesday, August 23 2006, 10-11am PT

  • Planning for 0.6.2
  • Generic web Repository Connector integration (Eugene)
  • Trac Connector rich editor (Steffen)
  • AbstractRepositoryConnector split into core and UI
  • Planning for 0.7 and 1.0
  • Zest website integration and release cycles

Wednesday, August 2 2006, 10-11am PT

Agenda

  • 0.6.1 post-mortem
  • 0.6.2 and 1.0 planning
  • Summer of Code status
    • Trac Connector (Steffen)
    • Bugzilla enhancements (Jeff)
    • JIRA
  • Design discussion on splitting AbstractRepositoryConnector into core/ui
  • Sandbox release for web connector (Eugene)

Vacations

  • Rob: 3rd - 8th
  • Mik: 8th - 17th

Actions

  • Consumers of APIs update Javadocs as they use them, a la wiki
  • Decide on conference call time and interval next meeting
  • Investigate Rome dependency for Sandbox (Mik)

Thursday, July 6 2006, 10am PT

  • wrap up discussion of 0.6 release
  • Trac integration status (Steffen)
  • enhancing Bugzilla connector status (Jeff)
  • Connector naming conventions
  • tasks API discussion. String-based task id, separate task id, url and repository url, (issues 146396, 149624, 149509), other refactoring of tasks, hits, query and repository classes
  • UI for repository settings
  • prioritizing for 0.7 and beyond
  • planning and use of Bugzilla priorities

Tuesday, June 13 2006, 10am PT

  • Schedule a regular meeting time and interval
  • Google SoC: Trac integration (Steffen)
  • Google Soc: enhancing Bugzilla connector (Jeff)
  • Repository connector API discussion (Mik)
  • Prioritize tasks for 0.6 (Mik)

Back to the top