TPTP-PMC-20090506

Logistics

  • Attending: Paul, Oliver, Kathy, Chris
    • Absent Ernest & Eugene

Any issues with last weeks summary?

  • No issues

4.6 update

4.6 test pass was good.

  • Were supposed to exit end of last week
  • We had a few to wrap items to clean up report
  • 100% complete with only 4% failure (awesome)

This week try to fix a few more bugs

We had a discussion about whether next test pass is full or not

  • The short back to back test pass at this stage of project is intended as warning to leads that a drop to Eclipse is upcoming and we need to be conservative.
  • We are operating in project level approval
  • Game plan: Ad hoc smoke testing along with stress testing of key areas

Paul regenerated EMF test models yesterday (part of upleveling to 1.5 JVM)

  • Intended to harness benefits of EMF 2.5
  • Turned to be a bit painful (3MB patches) but is done
  • This work should covers test, trace, statistical, probekit

We had a build discussion

  • Intel has network issues connecting to x86_linux
  • IBM not yet ready to fully transfer x86, em64T builds over to IBM
  • Intel to disable building of trouble platform temporarily

Deferrals out of 4.6

  • Test has only a few deferrals that customers will have issues with
  • Paul believes ones on the list will not be critical to consuming products.
    • In looking at the list, Oliver notes Some P2s got done. Oliver asks if the deferred P1s have been P2s to start with?
    • Paul notes he probably should haveshould have just done them first
  • Paul notes that some of the P1s on the defer list are actually deferrals from an even earlier release
    • Should in the future consider moving deferred bugs down to P2 for next release

Proposed P1 Deferrals: Test

  • 263776
    • Proxy create/update operations do not guard against resource modifications.
  • 157463
    • Cancel button for test execution job does not work.
  • 252958
    • Several datapool table actions do not support multi-row (records) selection.
  • 200586
    • Context sensitive help requires refactoring and new content.

Proposed P1 Deferrals: Platform

  • 215032
    • [POG] unload of profiling data does not free memory

Possible but hopefully not Platform deferral (High risk but not requested yet.)

  • 115325
    • 'Refresh' in Profiling Monitor view without saving lost active attach agent(s)

We had some discussion around the particular build that will be dropped to Eclipse

  • One or two defects we are waiting on a bit more testing.
  • Will decide later.

Misc

We discussed equipment transfer.

  • Chris to find "right of first refusal and transfer of ownership" details to forward to Kathy
  • After that, should get final go-ahead from IBM side.

Back to the top